Wednesday, 4 March 2015

A2 Media Studies Coursework Planning Documents: Risk Assessment

Risk Assessment
Group Members:                                                                                         Location:
Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N

Tripping over long Wires or other equipment.

All individuals filming and being filmed

2

4

6

Put all spare wires to the side as well as putting wires that are being used as close to the wall as possible.

Y

Dropping heavy instruments on limbs.

All individuals filming and being filmed

3

4

7

We will hold the guitars tight and firm as well as put the guitar shoulder straps on properly.

Y

The risk of teachers and students coming in or disturbing

All individuals filming and the ones being filmed

3

2

5

We will film in a safe area and ask if the room isn’t being used by anyone or is going to be using the room.

Y

The risk of people slipping over slippery surfaces and falling over when filming or are being filmed.

Everyone being filmed and the people who are filming.

1

4

5

We will make sure that the room is clear and hasn’t got any wet floors or any other slippery surfaces. Preferably, we will find a room with carpet floors.

Y

Contacts

Emergency Service:   
Robert Clack School:
  
Other Contacts:           

No comments:

Post a Comment